Earith Skatepark

Earith Skatepark is a concrete skatepark featuring a back-and-forth format with quarter pipes at each end and two differing height tabletop ramps in the middle.

The skatepark opened in March 2015. It was designed by Maverick and built by HAGS at a cost of £65,000 funded by WREN and Mick George.

The skatepark has floodlights, but the signage states that the park is not to be used after dusk.

Opening Times : Subject to opening and closing times
  • Concrete
  • Free
  • Outdoors
  • Address
  • Map
  • /// what3words
Earith Recreation Ground
Meadowlands Park
Earith
Huntingdon
PE28 3RB

Open in Google Maps

There are no parking spaces available near the skatepark.

Amenities

  • Lighting

There are no public toilets in the park or village.

Builder

The following suppliers were involved in the design and build of the current skatepark.