Alton Skatepark

Alton Skatepark is a concrete plaza style skatepark with mini ramp to one side. The plaza section features a back and forth between quarter pipes, with features including ledges, rails, banks, manual pags and 360 rollovers split over three levels across the park.

The concrete skatepark was built by Maverick in February 2020, replacing the original modular metal ramps and tarmac base. The original skatepark metal skatepark consisted of a back and forth run with a quarter pipe and flat bank either side of a funbox, and two ledges.

Opening Times : Subject to opening and closing times
  • Free
  • Outdoors
  • Wood
  • Address
  • Map
  • /// what3words
Chawton Park Road
Alton
Hampshire
GU34 1ST

Open in Google Maps

National Rail Alton 1.9 miles
Bus Playing Fields 0.1 miles 38

Builder

The following suppliers were involved in the design and build of the current skatepark.