Long Lawford Skatepark

Long Lawford skatepark was designed and built by Wheelscape, opening in 2013. It is an all concrete skatepark that features both street and transition elements and can be found in King George’s Field.

The skatepark starts on one side with a hipped bank leading off of which are two runs, a street course and a park run. The street course starts with a spine and a roll over and followign this is a large pump bump with rainbow rail that leads up to a raised level with hipped banks, stair set, hubba and a small spine. The park run here starts with a up and down kicker with hubba & rail and a driveway. Following this is a large roll over with jump box inset and volcano side and the run finishes with quarter pipe that is hipped with a long bowled edge.

Long Lawford skatepark is a great local park that has something for everyone of all abilities. There is a decent selection of obstacles that have been creatively arranged to make good use of the space, if you are in the area get down here and check it out.

Opening Times : Subject to opening and closing times
  • Concrete
  • Free
  • Outdoors
  • Address
  • Map
  • /// what3words
Long Lawford Skatepark
King George Field
Townsend Lane
Long Lawford
Warwickshire
CV23 9AB

Open in Google Maps

Rugby train station: As it is such a long distance from the station it would be recommended to get a bus or a taxi to get to Long Lawford skatepark.

School Street bus stop: Exit the bus onto Townsend Lane and Long Lawford skatepark will be in sight.

National Rail Rugby 3.0 miles
Bus School Street 0.1 miles 86

Builder

The following suppliers were involved in the design and build of the current skatepark.